Skip to content
Adtec Electrical Services

Extension leads and overloaded sockets: how much is too much?

Most homes and offices have more things to plug in than the building was wired for. Extension leads fill the gap, and used sensibly they are safe. Used as a permanent substitute for sockets, coiled behind furniture and loaded with heaters, they are one of the more common causes of electrical fires.

Last updated

Short answer

A standard UK extension lead plugged into a 13 amp socket can supply about 3,000 watts in total, however many outlets it has. Low-power items such as chargers, lamps and televisions can share a lead comfortably. High-power appliances such as heaters, kettles, tumble dryers and washing machines should be plugged straight into a wall socket. If you rely on extension leads every day, having more sockets installed is the safer, permanent answer.

What overloading actually means

Every extension lead is fed through a single plug with a fuse, normally 13 amps. That one plug and its flex have to carry the combined current of everything connected to the lead. Four outlets do not mean four times the capacity; they mean four things sharing one supply.

As a guide, 13 amps at mains voltage is about 3,000 watts. A phone charger draws a few watts, a television or a computer a few tens to a couple of hundred, a kettle or fan heater two to three thousand. So a lead can run a desk full of computer equipment without difficulty, but a kettle and a toaster together on the same lead will exceed it.

The fuse in the plug is there to protect against overload, but a fuse does not act instantly at a small overload. A lead loaded slightly above its rating for long periods will run hot at the plug pins and socket contacts long before the fuse operates. Heat is what does the damage.

Appliances that should have their own wall socket

Anything whose job is to make heat draws a large current: portable heaters, kettles, toasters, irons, tumble dryers, washing machines, dishwashers and air fryers. These are best plugged directly into a wall socket and not shared on a multi-way adaptor or lead. Fridges and freezers draw little while running but are better on their own socket so that they are not unplugged or tripped by something else.

Using extension leads safely

Choose a lead with a cable only as long as you need, from a reputable make, and with a fuse in its plug. Bar-type leads with the sockets in a row are preferable to cube-shaped block adaptors, which hang their weight on the wall socket and loosen its contacts over time.

Do not connect one lead to another to gain length or outlets. Each connection adds resistance and another place for heat to develop, and the first lead still limits everything downstream. Cable reels must be completely unwound before use with anything but the lightest load: a coiled cable cannot shed heat, and reels have been known to melt into a solid mass when used wound up with a heater.

Keep leads where they can be seen. Under carpets and rugs they overheat and are damaged by foot traffic without anyone noticing. Keep them away from water, do not use indoor leads outside, and replace any lead with a damaged flex, cracked casing or loose outlets. For regular outdoor use, a properly installed outside socket is the right answer; see our guide to outdoor socket installation.

Want a fixed written quote? Call 01235 430442 or send us the details.

Warning signs

Feel the plug of a lead that has been in use for a while. It should be no more than slightly warm. A hot plug, a socket faceplate that is warm or discoloured, a smell of hot plastic or fish, buzzing or crackling, or plug pins that have turned dark or blue are all signs of overheating at the contacts. Switch off, unplug once it is cool enough to handle, and do not reuse the lead or the socket until it has been checked.

Offices, shops and workshops

The same physics applies at work, with some additional duties. Employers are responsible for the safety of electrical equipment used by staff, and extension leads are among the items most often found damaged or misused during inspections. Leads trailing across walkways are a trip hazard as well as an electrical one, and desks fed by chains of leads from a single socket are a sign that the office has outgrown its wiring.

Regular inspection and testing of portable equipment, including leads, is the usual way of managing this; see PAT testing. Where the layout has changed permanently, fixed power in the right places is tidier and more reliable. Our guide to office power, floor boxes and trunking describes the options.

When to have more sockets installed

If an extension lead has been in the same place for months, it is doing the job of a socket that should be there. Typical cases are the television and entertainment corner, the home office desk, the kitchen worktop and the bedside. Additional double sockets in those positions remove the adaptors, the trailing flexes and the temptation to overload.

An electrician will check the existing circuit, including whether it has RCD protection and whether it can accept more points, and will advise if a new circuit is the better route for a heavily loaded area. Adding sockets to an existing circuit is not usually notifiable under Part P of the Building Regulations, whereas a new circuit is and must be certified by a registered electrician. Either way the work is tested to BS 7671 and certified.

Our page on extra sockets and lighting explains how we go about it, and the guide to planning sockets and switches helps you decide where new points would be most useful.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

No. Linking leads adds connections that can overheat and makes it easy to exceed what the first lead and the wall socket can supply. Use a single lead of the right length, or have a socket installed where you need it.

It is best avoided. A fan or oil-filled heater can use most or all of a lead's capacity on its own and is often left running for hours. Plug heaters directly into a wall socket.

Surge protection helps shield electronics from voltage spikes, but it does not increase how much the lead can carry. The 13 amp limit and the rules about heat and coiling still apply.

A double socket is not designed to supply two full 13 amp loads continuously. Two high-power appliances, such as a washing machine and a tumble dryer, are better on separate sockets. Lower-power items are fine.

Related pages

CallQuote