Office lighting: planning light levels, glare control and fittings
Office lighting is noticed mainly when it is wrong: a glare across a monitor, a dim corner, a meeting room that feels like a corridor. Good lighting is unremarkable, and achieving it is a matter of design choices made before any fittings are bought.
Last updated
Short answer
Office lighting should provide enough even light on the working area for the task, without glare on screens or in people's eyes. The lighting standard commonly used in the UK suggests around 500 lux for desk-based work, with lower levels for circulation areas. Low-glare LED panels or suspended fittings, sensible colour temperature and controls that respond to daylight and occupancy cover most offices, with emergency lighting planned alongside.
How much light an office needs
Light falling on a surface is measured in lux. The British and European standard for workplace lighting sets out recommended levels for different tasks, and the figure commonly referenced for writing, reading and screen-based office work is around 500 lux on the desk. Circulation areas, stores and rest areas need considerably less, while detailed tasks such as technical drawing need more. These are design recommendations and should be confirmed for your space by whoever designs the scheme.
The law itself is less specific. Workplace regulations require lighting to be suitable and sufficient, and the Health and Safety Executive publishes guidance on what that means in practice. The lighting standard is the usual way of demonstrating it.
Evenness matters alongside the headline figure. A room that averages the right level but has bright pools under each fitting and dull patches between them is tiring to work in. Fitting spacing, ceiling height and the reflectance of walls and ceilings all affect this, and lighting design software is used to check the result before installation.
Glare and screens
Most office work is done on screens, and a bright fitting reflected in a monitor or sitting in the edge of someone's vision causes discomfort over a working day. Fittings are given a glare rating, and those intended for offices are designed with diffusers, micro-prismatic optics or louvres to keep that rating low.
Position helps as well. Running rows of fittings parallel to the windows and to the line of sight, and avoiding a fitting directly above and in front of a screen, reduces reflections. Light directed partly upwards onto the ceiling, from suspended fittings, gives a softer result than light pushed straight down. Blinds remain the main tool for dealing with glare from the windows themselves.
Colour temperature
LED fittings are sold in a range of colour temperatures, from warm white through neutral to cool white. Neutral white is the usual choice for offices: it reads as clean and alert without the bluish cast of the coolest lamps. What matters most is consistency, as mixing colour temperatures in one space looks untidy.
Types of fitting
In offices with a suspended grid ceiling, recessed LED panels that replace a ceiling tile are the standard solution. They are economical and quick to install, and quality varies, so look at the glare rating, the driver and the stated life as well as the price. Where there is no grid, surface-mounted or suspended linear fittings do the same job, and suspended types are popular in offices with exposed ceilings and services.
Downlights suit receptions, corridors and breakout areas. Meeting rooms benefit from dimmable lighting, particularly where screens and video calls are used. Many offices also add task lights at desks so that people can adjust their own lighting.
If you are replacing older fluorescent fittings, the options and the savings are covered in our guide to a commercial LED lighting upgrade.
Want a fixed written quote? Call 01235 430442 or send us the details.
Controls
Lighting that stays on in empty rooms is wasted energy, and the Building Regulations for new and refurbished non-domestic buildings expect controls that prevent it. The common measures are presence or absence detection in meeting rooms, toilets, stores and corridors, and daylight-linked dimming for the rows of fittings nearest the windows.
Controls can be built into each fitting or run as a networked system across a floor. The right approach depends on the size of the office and how often it is rearranged. Our guide to commercial lighting controls compares the options.
Emergency lighting
Offices need emergency lighting on escape routes and in certain other areas, as identified by the fire risk assessment for the premises. It is often provided by emergency versions of the normal fittings, with a battery pack that keeps them lit if the supply fails, together with illuminated exit signs.
Emergency lighting should be planned with the general lighting and not added afterwards, because changing partitions and fittings can leave escape routes without cover. See our emergency lighting page and our guide to emergency lighting regulations.
Planning the work
Lighting is best decided once the furniture layout is known, since the same room lit for open-plan desks will not suit cellular offices. When partitions are added or moved, switching and sensor zones need to change with them, and each enclosed room needs its own control.
In an occupied office the installation is usually phased, area by area or outside working hours, to keep disruption down. On completion the work is tested and certified to BS 7671, and the lighting circuits are labelled at the distribution board. Part P of the Building Regulations applies to dwellings, so it does not govern office work, but the same standard of design, testing and certification applies, and employers have duties under the Electricity at Work Regulations to keep the installation safe.
Landlord approval may be needed in leased premises before fittings are changed, and it is worth checking the lease early. Our commercial lighting and office electrical pages explain how we approach lighting as part of an office fit-out or refurbishment.
Want a fixed written quote? Call 01235 430442 or send us the details.
