Electrician in Faringdon
Faringdon is a Vale of White Horse market town on the A420 between Oxford and Swindon, and after Wantage and Grove it is the nearest town to our Lyford base, about 7 miles away.
Market Place and Folly Hill
Faringdon's centre is a compact market town gathered around the Market Place and the Old Town Hall, with Folly Hill and its tower, Faringdon Folly, looking down from the east. The town was historically in Berkshire and has been in Oxfordshire since 1974. Its population was 7,121 at the 2011 Census, with an estimate of 7,992 by 2019 as new housing has been added.
Because we're so close, Faringdon is somewhere we can reach easily for smaller domestic jobs as well as larger projects, and return visits to finish testing or fit parts are simple to arrange.
Stone houses in the conservation area
The Faringdon Conservation Area covers the old centre, where many houses and shops are built of local stone with thick walls and old timber floors. Chasing solid stone for new cables is slow and messy, so we look for existing routes first: under floorboards, through loft spaces and behind skirtings. Where surface cabling can't be avoided, we use discreet trunking and agree positions with you.
Older stone buildings often have damp in places, and we take that into account when choosing where accessories and cables go.

Villages off the gas grid
The countryside around Faringdon, including Great Coxwell, Little Coxwell, and the villages in the Stanford and Watchfield & Shrivenham wards, has many homes without mains gas. Census 2021 figures for the Vale of White Horse show 8.3% of homes heated by electricity only and 5.7% by oil only across the district.
Homes relying on electricity for heating and hot water carry heavier loads, often with storage heaters, immersion heaters and electric showers all on one supply. Before adding anything major, such as an EV charger or a heat pump, we check the main fuse, the earthing and the consumer unit to make sure the installation can take it.
Rented properties
District-level Census 2021 figures show 15.7% of homes in the Vale of White Horse are privately rented. Landlords with cottages, flats above shops or newer houses in and around Faringdon need an Electrical Installation Condition Report at least every five years.
See: landlord EICRs.
What we do for Faringdon customers
Being close, we take the full range of work here: fault finding, extra sockets and lighting, consumer unit upgrades, rewires, landlord EICRs and commercial work for shops and businesses in the town.
Services for Faringdon
- Fault finding
- Consumer unit upgrades
- House rewires
- Landlord EICRs
- Domestic electrical
- Commercial electrical
Call 01235 430442 (Monday to Friday, 7:30am to 5:30pm) or use the form to tell us about the job. You can also see the other areas we cover.
