Skip to content
Adtec Electrical Services

Electrician in Newbury

Newbury sits south of us across the Berkshire Downs, and our work there is mainly commercial and project-based.

Commercial Newbury

Newbury has a strong business economy for its size. There are business parks and office buildings around the town, an industrial area along the canal and railway corridor, and Greenham Business Park on the former airbase to the south-east, which now hosts a wide range of industrial and commercial occupiers. The town centre adds shops, restaurants and offices.

For commercial clients in and around Newbury, typical work includes office and unit fit-outs, LED lighting replacements, additional power and data for growing teams, distribution upgrades in industrial units, and periodic inspection and testing.

Housing around the town

Newbury's housing is a mix of Victorian and Edwardian terraces close to the centre, inter-war and post-war suburbs, and major new developments such as the one on the former racecourse land. Nearby Thatcham has also grown with large estates. Older homes often need consumer unit upgrades or rewires, while newer homes need additions.

Given the distance from our office, we mostly take on larger domestic jobs and work for builders and developers in the Newbury area rather than one-off small repairs.

Finished commercial interior with pendant and recessed lighting

The run from Lyford

Newbury is roughly twenty miles south of Lyford, usually via Wantage and the A338 over the Downs or the A34 past Chieveley. It's generally around forty minutes, depending on traffic on the A34.

On the way and around the town we also cover places such as Chieveley, Hermitage, Thatcham, Speen and Hungerford, where farm buildings, period houses and newer estates sit side by side.

Business parks and project work

Business park offices around Newbury are often let on a repeat cycle, with each new tenant wanting a different layout. Rather than stripping everything back, we look at what can be reused: existing lighting circuits can often be re-zoned, floor boxes moved and small power extended, which saves time and waste. Where the landlord needs periodic testing for the common parts, that can be coordinated at the same time.

Industrial units on the former airbase and the town's other estates vary from small workshops to large production spaces. Common requests include new sub-distribution boards for expanding tenants, three-phase supplies for machinery, and replacement lighting.

For builders working on extensions and conversions in and around Newbury, we price from drawings, attend at first fix and second fix to fit the programme, and provide the testing and certificates the client and building control need at handover. Because the journey is longer than for jobs near Wantage, we plan visits to make the most of each day on site.

Services that suit Newbury

For businesses, we provide commercial electrical installations, office work, warehouse and industrial installations and testing. For builders and developers working in West Berkshire, we handle the electrical package on extensions, refurbishments and conversions. For homeowners, we take on rewires and consumer unit upgrades where the job is of a size that justifies the journey.

Heating, renting and the local economy

West Berkshire is one of the more off-grid council areas near us: Census 2021 records 12.0% of homes heated by electricity only and another 12.0% by oil only, with 17.1% privately rented. Electric-only homes put sustained loads on their installations, so we look closely at the board and supply before adding anything. Newbury's historic streets are covered by the Newbury Town Centre, Donnington Square and Shaw Road conservation areas. The town's largest employer is Vodafone, whose UK headquarters is here; we mention it to describe the area, not as a client.

Services for Newbury

Call 01235 430442 (Monday to Friday, 7:30am to 5:30pm) or use the form to tell us about the job. You can also see the other areas we cover.

Frequently asked questions

We cover commercial premises across the Newbury area, including the business parks around the town. Get in touch with the details of your unit and what you need.

Mainly larger jobs such as rewires and consumer unit upgrades. For small repairs, a more local electrician is often better value and we'll say so.

Yes. We regularly work alongside builders, pricing from drawings and fitting in with their programme from first fix to final testing.

Generally around forty minutes from Lyford, but the A34 can make that vary a lot, so we plan arrival times with that in mind.

Often it can. Sound fittings and circuits can usually be re-zoned or moved to suit a new floor plan, which reduces waste and cost compared with stripping everything out. We check condition first.

Related pages

CallQuote